The tooling is already said to be finished at builder Asia Harbor in Kaohsiung, Taiwan and, once lamination co*mences, the build time of the first one is likely to be 18 months, later dropping to 12 months.
Propulsion is typical of this full-displacement breed: twin 225hp John Deere diesels and straight ZF boxes and shafts. These are expected to deliver a maximum speed of just 10-11 knots but more importantly an ocean-crossing range of 3,000-4,000nm at a more sedate speed of six or seven knots.
The price for the first two Kadey-Krogen 60 Opens is set at $2.9million ex-works Taiwan for delivery within 24 months.
Source: Kadey-Krogen 60 Open first look: A clever twist on the traditional trawler template (http://ht**://www.mby.c**/news/kadey-krogen-60-open-trawler-125894)